प्रोजेक्ट विवरण व ओवरहेड्स सेटिंग

Total Length 0 m
Poles 0
Stay Sets 0
Substation None
Materials Base 0
Grand Estimate (incl. GST) 0
टूल:
💡 माउस से ड्रैग करें कैनवास सरकाने के लिए। स्क्रॉल जूम के लिए।
Map Legend
OH Bare ACSR
OH AB Cable
OH Armd XLPE
UG XLPE Trench
🪨 Rocky pole
🌾 Marshy pole
🛣️ Road Crossing
🛣️ NH Crossing
🚂 Rail Crossing

Detailed Bill of Quantities (BoQ)

Auto-generated | Rates per UPPCL Cost Data Book 2025-26 (Approved 31-Dec-2025) | Annexure ref. shown for each item
S.No Category Material / Item Description CDB Ref. Unit Qty Unit Rate (₹) Total Amount (₹) Actions

Abstract Cost Rollup Calculations

UPPCL RESSPO Standard
Cost Component Line / Civil (₹) Substation (₹) Total (₹)
1. Material Cost (Supply Base) 0.00 0.00 0.00
2. Cartage & Handling 0% 0% 0.00
3. Labor & Erection Charges 0% 0% 0.00
4. Civil Works & Laying Charges (Actuals as per CDB 2026) 0.00
Construction Base Subtotal (A) Materials + Cartage + Erection + Civil 0.00
GRAND TOTAL PROJECT ESTIMATE 0.00

Cost Breakdown

Overhead Bare Conductor spans0 m
Overhead AB Cable spans0 m
Underground Trench spans0 m
Rocky terrain poles0
Marshy terrain poles0
Road / Rail crossings0
Transition (OH↔UG) points0
Specs Breakdown
Grand Total (incl. GST) 0
All figures are as per UPPCL Cost Data Book 2026 & RESSPO Cost Schedules. Rates are editable in the Cost Book Manager tab.

📋 Per-Pole Material Schedule (CDB Reference)

UPPCL Cost Data Book 2026 - Annexure Viewer

Original Approved Document (31-Dec-2025)
↗️ नई विंडो में देखें (Full PDF)

त्वरित कनेक्शन एस्टीमेट जनरेटर (Quick Connection Estimator)

दूरी और ट्रांसफार्मर के अनुसार स्वचालित नक्शा व एस्टीमेट तैयार करें।

📝 Connection Specifications

⚡ Low Tension (LT) Line Section

💰 Live Cost Preview

Line Length (HT / LT) HT: 0 m | LT: 100 m
Calculated Pole Support Count 3
Estimated Base Materials Cost 0.00
Cartage & Handling 0.00
Labor & Erection Charges 0.00
Overheads & Contingencies 0.00
GST (18%) 0.00
Estimated Grand Total 0.00
Average Per-Meter Cost ₹ 0.00 / meter
CDB Benchmark Line Rate ₹ 0.00 / meter
CDB Benchmark Line Cost 0.00

📖 UPPCL CDB 2026 References

Low Tension AB Cable Lines [Annexure-13A, Pg. 49]
1×25 + 1×16 sq.mm ₹380 / meter
3×50 + 1×35 + 1×16 sq.mm ₹630 / meter
3×95 + 1×70 + 1×16 sq.mm ₹1,320 / meter
3×120 + 1×95 + 1×16 sq.mm ₹1,650 / meter
11kV Overhead Conductor Lines [Annexure-16, Pg. 52]
PCC Pole Support ₹370 / meter
ST Pole Support ₹810 / meter
11kV Underground XLPE Cable [Annexure-17, Pg. 53]
3Core × 70 sq.mm ₹2,370 / meter
3Core × 120 sq.mm ₹2,650 / meter
Distribution Transformers [Annexure-26, Pg. 61]
10 kVA (1-ph): ₹75,426
16 kVA (Al): ₹77,355
25 kVA (Al): ₹86,157
63 kVA (Al): ₹1,69,677
100 kVA (Al): ₹2,24,544
250 kVA (Cu): ₹6,51,984
400 kVA (Cu): ₹11,03,417
630 kVA (Cu): ₹14,41,975
🔔